A brief summary of the design goals, description, and performance of the BABAR Silicon Vertex Tracker is given. Results from radiation hardness tests are discussed, which indicate satisfactory operation up to 5 Mrad of accumulated radiation. The local alignment procedure has made significant improvements recently, and four readout sections were recovered during the BABAR shutdown in 2002. (C) 2003 Elsevier B.V. All rights reserved.

Status and future plans of the BABAR silicon vertex tracker RID H-3035-2011

LUSIANI, Alberto;
2003

Abstract

A brief summary of the design goals, description, and performance of the BABAR Silicon Vertex Tracker is given. Results from radiation hardness tests are discussed, which indicate satisfactory operation up to 5 Mrad of accumulated radiation. The local alignment procedure has made significant improvements recently, and four readout sections were recovered during the BABAR shutdown in 2002. (C) 2003 Elsevier B.V. All rights reserved.
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11384/7648
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 3
  • ???jsp.display-item.citation.isi??? 3
  • OpenAlex ND
social impact